Công việc thiết kế Dự án Light Rail Hành lang Tây Nam đã bị tạm dừng năm 2020 sau khi cử tri từ chối một biện pháp tài trợ địa phương cho nhiều cải tiến giao thông. Vào đầu năm 2022, Metro, TriMet và Cục Quản lý Vận tải Liên bang đã hoàn thành Tuyên bố Tác động môi trường cuối cùng (FEIS) và ban hành Hồ sơ Quyết định (ROD) để đảm bảo dự án đủ điều kiện nhận tài trợ của liên bang trong tương lai. Xem trang web dự án của Metro để truy cập vào các tài liệu này.

Overall Project Improvements
Getting to Stations

Regional modeling estimates that there will be 37,500 weekday trips on the Southwest Corridor Light Rail by 2035. Projected ridership and how people get to the stations affects how each station is designed. Below is information on how the project accounts for different ways of getting to the stations.

 

ridership data chart

Walking and Biking

Walking represents a sizable portion of how people are expected to access stations. To facilitate safe and comfortable walking connections, the project will contribute to a more fully connected, safe street network, with design treatments such as new mid-block crossings and sidewalks.

While biking is not accounted for in the regional ridership model, providing bike facilities is an important part of the project. Additionally, stations will accommodate secure locations to store and park bicycles with more space dedicated at stations demonstrating greater biking demand. The number of bike parking spaces at each station will be determined later in the design process.

Review biking and walking improvements on the Bike and Walk Improvements page.

Bike and walkshed map

Connecting community assets and neighborhoods

Transit and Transfers

With the addition of Southwest Corridor Light Rail service, TriMet will make changes in the bus network to maximize ridership, create new connections and minimize duplication. For purposes of ridership modeling, planners have made assumptions about potential bus service changes, based largely on TriMet’s Southwest Service Enhancement Plan (SW SEP). About a year prior to beginning Southwest Corridor Light Rail service, TriMet will engage riders in a public process to revisit these assumptions and confirm a bus service plan that serves future needs while minimizing service duplication.

Potential bus network map

Potential bus network

Park & Ride

Park & Ride facilities serve riders traveling from farther distances or from locations without convenient transit service to access the light rail system. Community engagement in Spring 2019 helped define the currently proposed quantity, locations, and type of Park & Rides. All proposed Park & Ride quantities are subject to further traffic studies and could be reduced in future design refinements.

Proposed Park & Ride locations map

Proposed Park & Ride locations

 

 

Quý vị có nhận xét hoặc câu hỏi?

Gọi 503-962-2150 hoặc gửi email để biết thêm thông tin.

 

 

Đăng ký nhận các bản cập nhật qua email


Đối tác dự án

TriMet Metro ODOT Quận Washington Thành phố Durham Thành phố Portland Thành phố Tigard Thành phố Tualatin